Precision in Stages

The architectural process from assessment to completion

Every project follows a structured methodology combining technical analysis, architectural planning, and precision execution.

Assessment
01

Assessment

Comprehensive site evaluation and structural analysis. We survey existing conditions, identify load-bearing elements, assess building fabric, and determine structural capacity. This phase includes photographic documentation, dimensional surveys, and initial feasibility analysis. Understanding what exists is essential before proposing what's possible.

Structural Planning
02

Structural Planning

Detailed engineering calculations and architectural design development. We create structural drawings, specify materials, calculate load paths, and design reinforcement strategies. This phase produces technical documentation including beam schedules, foundation details, and construction methodologies. Every element is calculated, specified, and coordinated.

Architectural Preparation
03

Architectural Preparation

Regulatory approvals and construction preparation. We manage building control submissions, coordinate structural engineer certifications, and finalize construction documentation. Material procurement, subcontractor coordination, and site logistics planning ensure smooth execution. Preparation determines construction quality.

Build Phase
04

Build Phase

Precision construction execution across all trades. Structural works, steel installations, timber framing, insulation systems, and interior finishing. Each phase is monitored for quality, accuracy, and compliance. Regular site inspections ensure work meets specifications. Building control inspections verify regulatory compliance at key stages.

Finishing & Compliance
05

Finishing & Compliance

Final installations, surface finishing, and quality verification. Plasterwork, decorative finishes, fixture installations, and detailed cleaning. Building control final inspection confirms compliance with approved plans. Energy performance certification documents thermal efficiency. Every detail receives attention.

Handover
06

Handover

Project completion and documentation delivery. We provide completion certificates, building control approvals, structural calculations, and warranty documentation. A comprehensive handover ensures you understand every aspect of the completed work. The space is ready for occupation, fully compliant, and built to last.

Methodology & Precision

Our process is designed to eliminate uncertainty. Every phase builds upon the previous, creating a structured progression from concept to completion.

We believe in transparent communication throughout. You receive regular updates, photographic documentation, and direct access to project management. No surprises, no ambiguity — just clear, professional execution.

This methodology has been refined through numerous projects across London. It accounts for the complexities of urban construction: access constraints, party wall agreements, building control requirements, and coordination with multiple stakeholders.

Quality Control

Continuous monitoring and verification at every construction phase

Timeline Management

Structured scheduling with realistic timelines and milestone tracking

Documentation

Comprehensive records including drawings, calculations, and certifications

Timeline Expectations

Project durations vary based on scope and complexity. Below are typical timelines for common project types.

Loft Conversion

Standard dormer or hip-to-gable conversion

8-12 weeks

Single-Story Extension

Rear or side return extension

10-14 weeks

Structural Retrofit

Insulation and energy efficiency upgrades

6-10 weeks

Complex Multi-Phase

Combined loft, extension, and retrofit work

16-24 weeks

Timelines include planning, preparation, construction, and finishing phases. Specific durations depend on project complexity, site conditions, and regulatory requirements.